Click panel name to open/close that panel. CTRL + F searches open panels.

NameDR:T1E
Category23-17 11 15 : Wood Doors
DescriptionInternal Double Door
Installed ByContractor
ManufacturerTodd Doors
ModelNumberRIGA OAK  (video search)
Referencen/a

1 item found
PropertyValueUnit
Functionn/an/a

7 items found
NameAccess ThruInstalledOnSerial NumberBar Code
DR:T1E_203B_236520203   203   28-09-2023T01:01:01n/an/a
DR:T1E_205B_237155205   205   28-09-2023T01:01:01n/an/a
DR:T1E_207B_237436207   207   28-09-2023T01:01:01n/an/a
DR:T1E_209B_237519209   209   28-09-2023T01:01:01n/an/a
DR:T1E_211B_237582211   211   29-09-2023T01:01:01n/an/a
DR:T1E_213B_237641213   213   29-09-2023T01:01:01n/an/a
DR:T1E_215B_237696215   215   29-09-2023T01:01:01n/an/a

2 items found
DocumentTypeStatusDescription
SpecificationProduct DataApprovedProduct Data File Collection Form
Warranty CertificateCertificateApprovedProduct Data File Collection Form

Available
Mfg. Warranty Descriptionn/a
Mfg. Parts POCTodd Doors
Mfg. Parts Duration5 year
Mfg. Labor POCTodd Doors
Mfg. Labor Duration5 year

Extended Warranty POCn/a
Ext. Durationn/a

Not Available
PartDescriptionRcmd / CriticalSupplierPart No.
(none found)

Frequency: 1 months
TaskDescriptionDuration
1Check that all hardware (locks, opening mechanisms, etc.) operates smoothly. 1 minutes
2Make sure any exposed hardware screws are tightened securely. 1 minutes
3Clean any sand, dirt or dust from door and window hinges, sills and tracks. 1 minutes
4Check doors for smooth operation. Wood doors require a stabilization period after installation, sometimes taking up to a year to adjust to humidity levels and other environmental factors.1 minutes