NameLighting and Appliance Panelboard - 400V MCB - Surface
Category23-35 31 29 : Switchboards
DescriptionLighting and Appliance Panelboard - 400V MCB - Surface_400 A
Installed ByContractor
ManufacturerSchneider Electric UK
ModelNumberSEA9BPN8  (video search)
Reference26 24 16.A

4 items found
PropertyValueUnit
Ballast Voltage600V
L.A.P. Depth146.1n/a
L.A.P. Height1574.8n/a
L.A.P. Width508n/a


1 item found
DocumentTypeStatusDescription
Warranty InformationCertificateApprovedProduct Data File Collection Form

Available
Mfg. Warranty Descriptionn/a
Mfg. Parts POCSchneider Electric UK
Mfg. Parts Duration5 year
Mfg. Labor POCSchneider Electric UK
Mfg. Labor Duration5 year

Extended Warranty POCn/a
Ext. Durationn/a

Not Available
PartDescriptionRcmd / CriticalSupplierPart No.
(none found)

Frequency: 2 months
TaskDescriptionDuration
1Mechanism - Check the MCH gear motor charging time at 0.85 Un5 minutes
2Mechanism - Check the general condition of the mechanism5 minutes
3Mechanism - Check the number of device operating cycles5 minutes
4Breaking unit (arc chutes + contacts) - Check the condition of the breaking unit5 minutes
5Breaking unit (arc chutes + contacts) - Check mounting of arc chutes and filter cleanliness5 minutes
6Auxiliaries - Check operation of indication contacts (OF, PF)5 minutes
7Auxiliaries - Check closing operation with XF closing voltage release at 0.85 Un5 minutes
8Auxiliaries - Check opening operation with MX opening voltage release at 0.70 Un5 minutes
9Auxiliaries - Check closing and opening operations with MN undervoltage release5 minutes
10Auxiliaries - Check time delay of MNR delayed undervoltage release5 minutes
11Control unit - Check microswitches OF/SDE/PF/CH5 minutes
12Control unit - Check M2C programmable contacts5 minutes
13Control unit - Save protection settings, reports, and event logs with EcoStruxure Power Commission software5 minutes
14Control unit - Check overcurrent protection5 minutes
15Chassis - Check operation of CD, CT, CE position contacts and EF auxiliary contacts5 minutes
16Chassis - Check operation of safety shutters5 minutes
17Chassis - Clean chassis and check presence of grease on chassis5 minutes
18Chassis - Check disconnecting contact clusters5 minutes
19Power connections - Check connection system5 minutes

Frequency: 2 months
TaskDescriptionDuration
1Device - Check the general condition of the device5 minutes
2Mechanism - Operate the device manually and electrically5 minutes
3Mechanism - Charge the device electrically with MCH gear motor5 minutes
4Mechanism - Check the complete closing of device poles5 minutes
5Auxiliaries - Check auxiliary wiring and insulation5 minutes
6Control Unit - Check device tripping and operation of SDE fault-trip indication contacts5 minutes
7Control Unit - Check ground-fault (MicroLogic 6.0 X) or earth-leakage (MicroLogic 7.0 X) protection function5 minutes
8Control Unit - Check operation of Energy Reduction Maintenance Settings (ERMS)5 minutes
9Device locking - Operate device keylocks5 minutes
10Device locking - Operate device padlocks5 minutes
11Chassis - Check device racking operation5 minutes
12Chassis - Check IBPO racking interlock between racking handle and opening pushbutton (MasterPact MTZ2/MTZ3)5 minutes
13Chassis - Check EIFE chassis position limit switches5 minutes
14Chassis locking - Operate chassis keylocking system5 minutes
15Chassis locking - Operate chassis padlocking system5 minutes
16Mechanical interlocking - Operate interlocking systems5 minutes

Frequency: 10 months
TaskDescriptionDuration
1Device - Measure insulation resistance5 minutes
2Mechanism - Check opening and closing forces5 minutes
3Mechanism - Clean and regrease the mechanism5 minutes
4Breaking Unit - Measure the contact resistance for each pole5 minutes
5Auxiliaries - Check opening time of MX opening voltage release5 minutes
6Auxiliaries - Check closing time of XF closing voltage release5 minutes
7Auxiliaries - Check opening time of MN undervoltage release5 minutes
8Auxiliaries - Preventively replace the XF, MX, MN voltage releases5 minutes
9Auxiliaries - Preventively replace MicroLogic X control unit and electrronic modules5 minutes
10Control unit - Diagnose the performance of the MicroLogic X control unit functions5 minutes
11Control unit - Preventively replace the MicroLogic X control uni5 minutes
12Chassis - Check connection/disconnection torque5 minutes
13Chassis - Clean and regrease chassis of MasterPact drawout devices5 minutes
14Communication system - Check data transmission over the IFE Ethernet interface or EIFE embedded Ethernet interface5 minutes
15Mechanical interlocking - Operate mechanical interlocking by cable5 minutes
16Mechanical interlocking - Operate mechanical interlocking by rod5 minutes

Frequency: 1 months
TaskDescriptionDuration
1DANGER - HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH5 minutes
2Apply appropriate personal protective equipment (PPE) and follow safe electrical work practices. See NFPA 70E or CSA Z462 or local equivalent.1 minutes
3This equipment must be installed and serviced by qualified electrical personnel.1 minutes
4Turn off all power supplying this equipment before performing maintenance inspections. Assume that all circuits are live until they are de-energized, tested, grounded, and tagged. Consider all sources of power, including the possibility of backfeeding and control power.1 minutes
5Always use a properly rated voltage sensing device to confirm that power is off.1 minutes
6Replace all devices, doors, and covers before turning on power to this equipment.1 minutes
7Beware of potential hazards and carefully inspect the work area for tools and objects that may have been left inside the equipment.1 minutes
8Failure to follow these instructions will result in death or serious injury.1 minutes